RouteCap is a powerful algorithm-based optimization tool which can generate an efficient plan for your supply chain. The optimized plans generated adhere to time, zone, manpower and vehicle constraints as per your business operations requirement while balancing workload, minimizing the amount of resources utilized and maximizing savings.
RouteCap offers multiple functionalities which serve various business requirements. These features have been encapsulated into modules which serve specific business requirements while avoiding inessential features.

Find the most optimal solution to best utilize your resources.

The UI has been designed to improve efficiency and keep the environment clutter free.

Ensure data and model security by controlling and limiting who has access to the optimizer..

Ensure data and model security by controlling and limiting who has access to the optimizer.Dispatch your optimized plan to the delivery staff and also track the status of each vehicle through the RouteCap mobile app on Android and iOS.
Plan your routes while adhering to business, time and vehicle constraints. Maximize your operational savings while reducing the time taken to generate the plan.
Determine the business capacity and demand for various resources like manpower, vehicles etc. based on historical data and past resource demand.
Optimize your resources and routes based on live demand. Maximize your savings by efficiently allocating vehicles to real time requirement. Ex: Food delivery, cab allocation etc.

Efficiently converts the provided addressed into coordinates to calculate distances for an accurate plan.

Plan your route across several different warehouses/depots with each containing vehicles with different capacities.The multi-trip functionality also allows vehicles to come back to the depot to reload and served more orders.

Visualize the plan and route for the solution while also viewing any violations of the constraints.
| Features | RouteCap | Others |
|---|---|---|
| Multi Objective Route Optimziation | ||
| Smart Order Clubbing with time windows | ||
| Multi depot planning | ||
| Map View | ||
| Driver Mobile Application | ||
| Real time optimization | ||
| Access mobile app data offline | ||
| Multi trip Optimization | ||
| Optimization for same day pick-up and drops | ||
| Dynamic Gantt with violations visibility | ||
| Unassigned planning on dynamic gantt | ||
| Split Order delivery in same time window | ||
| Accurate Distance-Time matrix using cluster zones | ||
| Performance driven custom Optimization parameters | ||
| Personalized Solution support |
Accurate geo-coding of locations
Add business constraints and parameters
Maximize the deliveries and customers served
Accurate geo-coding of locations
Cluster deliveries based on type of order/material
Add business constraints and parameters
Minimize the operational costs
Plan for both pick-up and delivery of parcels
Accurate geo-coding of locations
Add business constraints and parameters
Minimize the turnaround time and improve delivery efficiency
Planned deliveries
Water bottle delivery
Airport drops and pick-ups
Leisure/travel/sports pickups and drops
Dynamic/Real time optimization
Food deliveries , Cab pick and drops
Kindly enter your details below to find out how RouteCap can help reduce operational costs, save time and create a positive impact on your business.
+91-74119-14346
bd@ormae.com
Adding {{itemName}} to cart
Added {{itemName}} to cart