About the customer

A civil infrastructure development firm that was engaged by the government to build a concrete road between two major cities, covering a distance of 110 miles. The concrete batching plant had to perform without failure for long periods of time so that the contractor could deliver and meet the promised deadlines.

Business Problem

The contractor signed up with ORMAE for a solution that could:

  • Determine failure probability of the batching plant.
  • Provide early warning signals.

Our Approach

ORMAE's solution was built using the following:

  • Concrete batching plant’s SCADA records.
  • Production data.
  • Alarm data.
  • Analysis of variables (batching plant parameters).
  • Historical repair and breakdown records (using LSTM auto-encoder model).

The Result

ORMAE’s solution for the road construction contractor succeeded in predicting batching plant failure in advance through early warning signals (3 – 4 days).